Phase III Project consists of construction of a gravity sewer collection system, pumping station, a force main and storm water drainage improvements in the area generally bounded by Pembroke Road to the north of SW 64 Avenue and to the east of SW 25 Street to the south, and the Turnpike to the west, within the public right-of-way. The Preliminary Design (PDR) effort will evaluate and identify system requirements required to efficiently design the wastewater collection/stormwater management system within the Phase III area. Project offers the means to eliminate out dated and non functioning septic tanks through a central wastewater collection system. 


  1. February 2019
  2. January 2019
  3. December 2018
  4. November 2018
  5. October 2018

February 2019  - HMII3 Project Update                                                                                                                                                                

02.25.19                                                                                                                                                                                                                            Drainage Construction -Expect Road Closures and Detours Construction begins on SW 21st and SW 22nd Streets from SW 66th Avenue to SW 64th Avenue Construction on SW 67th Avenue from SW 23rd Street to SW 20th Street to SW 67th Lane is in progress.                                                                  Roadway Restoration- Expect Road Closures and Detours Construction of curb, sub-grade and base begins on SW 18th Street and SW 20th Street between SW 66th Avenue and SW 68th Avenues Sodding swales begins along Sunshine Boulevard from SW 30th Street to SW 23rd Street Construction of sidewalks and curbs on SW 25th Street from SW 64th Avenue to SW 68th Avenue is in progress.                                                                                  Sanitary Sewer Construction Construction begins on SW 24th Street from SW 66th Avenue to SW 64th Avenue Construction on SW 67th Terrace to SW 66th Avenue is in progress                                                                                                                                                                                                                                                                                                                                                                                                                                                                    02.18.19                                                                                                                                                                                                                            Drainage Construction-Expect Road closures and Detours SW 21st Street-between SW 66th Avenue and SW 64th Avenue begsin 2/18/19; SW 22th Street between SW 66th Avenue and SW 64th begins 2/18/19, SW 67th Avenue from SW 24th Street to SW 21st Street remains in progress.  Sunshine Boulevard from SW 22nd Street to SW 20th Court remains in progress.  SW 68th Terrace from SW 23rd Street to Sunshine Boulevard remains in progress.  

02.09.19                                                                                                                                                                                                                            Drainage Construction -Expect Road Closures and Detours SW19th Street- between SW 66th Avenue and SW 64th Avenue is in progress SW 20th Street between SW 66th Avenue and SW 64th Avenue remains in progress SW 67th Avenue from SW 24th Street to SW 21st Street remains in progress Sunshine Boulevard from SW 22nd Street to SW 20th Court remains in progress SW 68th Terrace from SW 23rd Street to Sunshine Boulevard remains is in progress  Sewer Construction SW 66th Avenue between SW 25th Street SW 22nd Street sewer construction remains in progress. SW 67th Terrace between SW 20th Court to SW 66th Avenue sewer construction remains in progress.                                                                                                                          Drainage Construction SW19th Street- between SW 66th Avenue and SW 64th Avenue is in progress SW 20th Street between SW 66th Avenue and SW 64th Avenue remains in progress SW 67th Avenue from SW 24th Street to SW 21st Street remains in progress Sunshine Boulevard from SW 22nd Street to SW 20th Court remains in progress SW 68th Terrace from SW 23rd Street to Sunshine Boulevard remains is in progress.                                                Roadway Restoration Sunshine Boulevard from SW 30th Street to SW 23rd Street extensive swale and irrigation restoration is in progress.          Wastewater- Reynolds Construction continued running two crews on sewer. One crew continued laying sewer main along 20 CT, east of 67 Ave toward 66 Ave and the other has been laying sewer main along SW 67 toward 20 CT. Contractor has divided the installstion into three quardrants. Quardrant 1 includes the installation between Sunshine Blvd. and SW 68 Ave. Quardrant 2 includes all the streets between SW 68 Ave and SW 66 Ave. Quardrant 3 includes all the streets located east of 66 Ave. As of to this date, contrator has completed the installation of sewer main in quardrants 1 and 2 not including the installation of sewer laterals. Construction of sewer to date is at 48% complete.