City of Miramar Strategic Plan

Your City, Your Future!

What does the future of our city look like to you? Join us for a community outreach meeting to share your vision and help shape our City's strategic plan.

Why Attend?

  • Help shape the City's future priorities
  • Share your feedback & ideas
  • Learn about the Strategic Plan process

While at the meeting be sure to complete a short survey and be entered for a change to win a iPad, iPhone, or Gift Cards.

Meeting Dates and Locations

  • Thursday, April 30, 2026 from 6PM to 8PM
    Multi-Service Complex, 6700 Miramar Parkway, Miramar, FL 33023
  • Thursday, May 14, 2026 from 6PM to 8PM
    Sunset Lakes Community Center, 2801 SW 186th Ave., Miramar, FL 33029
  • Thursday, May 28, 2026 from 6PM to 8PM
    City Hall, 2300 Civic Center Place, Miramar, FL 33025

Register Here to Attend a Meeting!

Projects Completed in West Miramar in the past 3-5 Years(2021-2026)

Economic Development: Since 2020, four (4) companies have relocated to the City, hiring 350+ employees and investing $13+ million dollars!

Project Name City Dept.  Project Scope Estimated Cost Status
Police Station West District Station Police
  • Parking lot painting, new grass, privacy fencing, tree trimming & interior painting
  • Audio visual system to be replaced ($100K)
  • Interior upgrades to the Gun Range, including new sound-proofing walls, interior painting, floor polishing, upgraded LED lighting, replacement of roofing panels
  • Roof replacement, including built-up roofing system at flat, areas tile roofing system at sloped area (Total Cost: $1,013,030)
$538K   Completed
Reclaimed Water Expansion West of Dykes Road Utilities 

Installation of new reclaimed water mains along:

  • Miramar Parkway, between SW 160 Avenue and SW 184 Avenue,
  • Pembroke Road between SW 160 Avenue and SW 178 Avenue.
  • North to south on SW 172 Avenue between Pembroke Road and Bass Creek Road,
  • SW 184 Avenue between Miramar Parkway and SW 25 Street.
$8,000,000  Completed May 2025
Milling and Resurfacing of Miramar Parkway Public Works 

 Milling and resurfacing from:

  • SW 172 Ave to Flamingo Road
 $2.5M Completed December 2024 
Dykes Road Mobility Improvements Engineering Services
  • Construct 6’ bike lanes along Dykes Road.
  • Road resurfacing
  • Upgrade signage and pavement markings
  • Provide exclusive lane from eastbound Miramar Parkway to southbound I-75 ramp.

Grant Funded by Broward MPO 

$6,000,000   
 Miramar Pkwy & SW 184 Ave. Engineering Services
  • Buffered Bike Lanes & Multi-Use Path
  • Intersection Improvements

Grant Funded by Broward MPO

 $1,400,000  
 Bass Creek Rd. & SW 148 Ave. Engineering Services
  • Roundabout & Multi-Use Path
  • Mid-Block Crossing for School
  • Dedicated Turn Lane for school traffic

Grant Funded by Broward MPO

 $2,900,000  
Pembroke/Flamingo Right Lane Engineering Services Construction of right turn lane from eastbound Pembroke Road to southbound Flamingo Road. $552,954  Completed October 29, 2025
Monarch Lakes Park
2150 SW 136th Ave.
Parks & Recreation
  • Added 2 pavilions
  • New playground
  • New standalone restroom building
  • Added fencing along exterior border
  • New splashpad
  • New STEAM Learning Trails Signage
  • New Communication Board
  • Extended parking lot
 $1,972,000  
Flamingo Estates Park
2000 SW 137th Way
Parks & Recreation
  • New ADA Whirl playground piece
  • Replaced sand surface with ADA mulch in the playground
  • New fitness stations along the walking path
  • Walking path repairs
  • Resurfaced basketball courts & tennis courts
  • Added electrical outlet and new picnic benches to the pavilion
  • Replaced volleyball netting system
  • Replaced clay in baseball court
 $105,964
(FRDAP Grant Contribution $50,0000)
 
Vizcaya Park
14200 SW 55th Street
Parks & Recreation
  • New LED MUSCO field lighting on East Soccer/Football Fields
  • New bottle filling station
  • Basketball court resurface to include pickleball lines and portable pickleball netting systems
  • Replaced faded and rusted playground pieces & refurbished the metal poles
  • 5 new fitness stations around walking path
  • Refurbished and repaired damaged parts of walking path
  • Converted a multipurpose room into a weight room for the community
  • Renovation of pavilions
  • New picnic benches at all of the pavilions and splash pad area
 $600,000
(FRDAP Grant Contribution of $200,000)

 

 

Huntington Park North
14850 Bass Creek Road 

 

 

Huntington Park South

Parks & Recreation 
  • Replaced outdated playground structure
  • Replace playground surface with ADA mulch surface
  • Repaved and restriped the parking lot
  • Repaired all parking curbs

 

  • New stand alone restroom building
  • New shade covering over the playground
  • New pavilion
  • 4 New fitness stations along the walking path
  • Added electricity to both of the pavilions
  • Walking path Repairs
  • Resurfaced basketball court and tennis court
  • New lighting in the parking lot for added security.

 $110,000

 

 

 

$620,751
(FRDAP Grant Contribution: $200,000)

 

 
Silver Shores Park
15700 Pembroke Road
Parks & Recreation
  • Renovation of Restroom
  • Resurfacing of basketball courts
  • Resurfacing of tennis courts with root intrusion removal
  • Parking lot asphalt repairs
  • Soccer field sod replacement
  • Replacement of sand surface in playground with ADA mulch surface.

 

 $205,000  
Silver Lakes Sports Complex
17450 SW 23rd Street
Parks & Recreation
  • Renovation of Restroom and flooring
  • New water bottle filling station
  • Painting of restroom building
  • New safety netting around all baseball fields.

 

$110,500   
Silver Lakes Tennis Complex
17450 SW 23rd Street
Parks & Recreation 
  • Removal of root intrusion on hard tennis courts
  • Replacement of damaged asphalt & resurfacing of all tennis courts with relining
  • Replacement of damaged fencing and gates around all hard tennis courts
  • Upgrade of lighting on tennis courts with LED lighting
  • Resurfacing and relining of basketball courts
  • 4 new pickleball courts with LED lighting, water fountain and covered seating
 $580,000  
Island Park
2925 SW 178th Ave.
Parks & Recreation
  • Cleanup and beautification of entire park and landscape area
  • Replacement of sand surface in playground with ADA mulch surface
  • Refurbishment of pavilion and walking bridge from the park to the community

 

 $100,000  

City of Miramar Strategic Plan flyer with upcoming meeting dates in April and May and different locations from 6PM to 8PM

 

Take the Survey

City's Strategic Plan Flyer with a QR Code to take a survey